Our Projects

                                                                     OYAK Adana Cement Plant

                                                                        Sönmez Cement Plant 

Services

Crusher Maintenance and Repair

 

As part of a project carried out at Sönmez Cement Plant, crusher maintenance and repair works were successfully completed by our expert team within a 15-day period. During the project, all maintenance and overhaul activities were performed with precision to improve equipment performance and support the plant's operational continuity.

Belt Conveyor System Fabrication and Installation 
The fabrication and installation of the belt conveyor system were successfully carried out by our expert team in full compliance with occupational health and safety standards. Throughout the project, quality, safety, and efficiency were prioritized to ensure reliable and trouble-free system operation.

Crusher Installation


The installation of crusher equipment is carried out by our expert team in accordance with technical standards and occupational safety requirements. Throughout the installation process, quality, safety, and operational efficiency are prioritized to ensure reliable commissioning and optimum equipment performance. 

Covered Clinker Storage Roof Installation


The roof installation of the covered clinker storage facility at Adana Cement Plant was successfully completed by our expert team. Throughout the project, all works were carried out in compliance with safety regulations, quality requirements, and technical standards, ensuring timely and efficient project completion. 

Gearbox and Hydraulic Turbo Overhaul


 Click here and start typing. In ea voluptate velit esse quam nihil molestiae consequatur vel illum qui dolorem eum.

Raw Mill Roller Dismantling and Installation
The dismantling and installation works of the raw mill roller system at Sönmez Cement Plant were successfully carried out by our expert team. All activities were performed in accordance with safety regulations and technical standards, ensuring the safe recommissioning of the system within the planned schedule.